Utilities to the Grade 5 portable have been reconnected while construction continues. Other exciting additions out back are two concrete pads. One, adjacent to the playground, will be set up with two basketball nets. The other, across the field, is being setup for track and field throwing events.
Wednesday, October 28, 2009
Backyard Renovations
Preparations are being made for the addition of a second portable at the back of PCS. This past weekend, the Grade 5 portable was relocated to a temporary location as groundwork is being done to the original location.
Utilities to the Grade 5 portable have been reconnected while construction continues. Other exciting additions out back are two concrete pads. One, adjacent to the playground, will be set up with two basketball nets. The other, across the field, is being setup for track and field throwing events.
Utilities to the Grade 5 portable have been reconnected while construction continues. Other exciting additions out back are two concrete pads. One, adjacent to the playground, will be set up with two basketball nets. The other, across the field, is being setup for track and field throwing events.